real time web analytics
Report - - Byker culvert, Newcastle upon Tyne, April 2013 | UK Draining Forum | 28DaysLater.co.uk

Report - Byker culvert, Newcastle upon Tyne, April 2013

Hide this ad by donating or subscribing !

The Stig

Urbex = Nosey Bastard
28DL Full Member
Visited with Nic81, had a spare hour or so on a Saturday afternoon, before retiring to the local pub which is next to the culvert

History...
Concrete culvert constructed between 1907-1911 carrying the Ouseburn underneath the suburb of Heaton. Runs for a total length of 2150 ft and built at a cost of £23,000. The south end lies underneath Ouseburn Viaduct, some of which has been paved over and is used for horse riding.


DPP_1009.jpg


DPP_1008.jpg


DPP_1007.jpg


DPP_1006.jpg


DPP_1005.jpg


DPP_1004.jpg


DPP_1000.jpg


DPP_1001.jpg


Cheers fir viewing :)
 
Top