There's 9 threads on Dobroyd mill, but nothing on the culvert which passes beneath
shame really because it's well worth the effort.
The beck exits the mill pond (Dobroyd mill), then passes through a 400yd culvert by the arch footbridge (infall)
this merges with a 2nd culvert carrying the Jackson bridge beck exiting by the road bridge (outfall)
mill pond
source to the mill
(infall)
nice brickwork,
but had to crawl through here stooping to say the least.
2nd culvert carrying the Jackson bridge beck
didn't pass this point, because the floor had been washed away & the water was too deep
I was wearing wellingtons so will return sometime with waders.
merging of the 2 becks
(outfall)
thanks
shame really because it's well worth the effort.
The beck exits the mill pond (Dobroyd mill), then passes through a 400yd culvert by the arch footbridge (infall)
this merges with a 2nd culvert carrying the Jackson bridge beck exiting by the road bridge (outfall)
mill pond
source to the mill
(infall)
nice brickwork,
but had to crawl through here stooping to say the least.
2nd culvert carrying the Jackson bridge beck
didn't pass this point, because the floor had been washed away & the water was too deep
I was wearing wellingtons so will return sometime with waders.
merging of the 2 becks
(outfall)
thanks
Last edited: