Visited with Walders & Phuge
Was the 3rd site of an all nighter in London, by the time we arrived here the weather had turned to wind and rain, so didnt bother pushing to the top, pictures taken from about six floors from the roof.
Proposal date 2005
Construction start date 2008
Completion date 2010
Roof Height 97.15
Total Floors 26
Status On Hold
Was the 3rd site of an all nighter in London, by the time we arrived here the weather had turned to wind and rain, so didnt bother pushing to the top, pictures taken from about six floors from the roof.
Proposal date 2005
Construction start date 2008
Completion date 2010
Roof Height 97.15
Total Floors 26
Status On Hold
Last edited: