This has been done a few times times now, but demolition has started on a fundamental part of the remaining part of the factory, as the next phase of demolition has started. This will see the disposal of CAB2 (Car assembly building). This will leave only CAB1, sales centre, conference centre and the development & technical centre currently used by MG. These photos (much which are CAB2) will most likely be the last photos taken of the line
On the day we visited, we watched as the final shells were lifted off the tracks, and saw the first of the shells strapped on low loaders leaving the site. A third of CAB2 has now gone.
Lots more photos available, but only chose to upload a select few. Let me know if you would like to see any more.
Enjoy!
img host
On the day we visited, we watched as the final shells were lifted off the tracks, and saw the first of the shells strapped on low loaders leaving the site. A third of CAB2 has now gone.
Lots more photos available, but only chose to upload a select few. Let me know if you would like to see any more.
Enjoy!
img host
Last edited: