real time web analytics
Report - - St. Agnes Church and School Detroit, Mi January 2012 | European and International Sites | 28DaysLater.co.uk

Report - St. Agnes Church and School Detroit, Mi January 2012

Hide this ad by donating or subscribing !

Slimspidey

28DL Full Member
28DL Full Member
I took these this past Sunday.

The Church was finished in 1924 but I couldn't find out the finish date of the school. The materials would indicate they were built at the same time. Also there are three main buildings connected by a tunnel that link the church to the school and boiler room.

I didn't get a chance to run the tunnel from the church to the boiler room as there was a group or 'tourists', hood tourists making all kinds of noise and the cops rolled by a few times.

I was able to rescue some original blue prints that were stashed in the basement of the rectory. I normally don't take ANYTHING but I was able to get the prints to a very thankful Detroit Historical Society connection I have.

_DSC5662.jpg


The school is to the right of the church.

_DSC5621.jpg


side.jpg


_DSC5635.jpg



pano.jpg


The last two shots were from the organ balcony, the scrappers have made quick work of the organ pipes and other precious metals.

_DSC5633.jpg


Stairs leading to said balcony

_DSC5630.jpg


_DSC5628.jpg


_DSC5626.jpg


_DSC5624.jpg


The basement of the church is showing A LOT of water damage.

_DSC5660.jpg


_DSC5661.jpg


A stage in the basement

Here are some shots from inside the school.

_DSC5666.jpg


_DSC5667.jpg


_DSC5664.jpg


_DSC5672.jpg


_DSC5671.jpg


_DSC5673.jpg


From the roof of the school

roof.jpg
 
Last edited:

Who has read this thread (Total: 4) View details

Top