real time web analytics
Report - - Stanley Moor Waterworks, Buxton - June 2018 | Industrial Sites | 28DaysLater.co.uk

Report - Stanley Moor Waterworks, Buxton - June 2018

Hide this ad by donating or subscribing !

GRONK

Useful Idiot
Regular User
June 2018

The Visit

Version 1: I embarked on a solitary adventure to this place on a delightful June day. The structure itself appeared rather petite, so my visit lasted only about 20 minutes. The water works facility is concealed from the bustling main road, located on a steep embankment making it easy to overlook while driving by. Although it was evident that the site had been abandoned for quite some time, surprisingly, there was minimal damage to the infrastructure within.


The History
Nestled in a picturesque corner of the Peak District in Derbyshire, just outside the charming market town of Buxton, lies The Buxton Corporation Waterworks (BCWW). This remarkable structure was built back in 1957 to cater to the now decommissioned Stanley Moor reservoir, located to the southwest. The reservoir itself was a modest rectangular shape, surrounded by earth embankments and resting on a combination of limestone and millstone grits. To ensure its durability, the interior was lined with puddle clay and topped with a layer of protective masonry pitching.

The reservoir relied on two nearby streams, one to the west and another to the north, as its primary water sources. These streams were cleverly intercepted and guided through aqueducts to the intake chute, thanks to the operation of "leaping weir" sluices.

However, despite these meticulous construction efforts, the reservoir faced a significant challenge. It was situated on a geological fault-line where limestone and millstone grit met, resulting in a troubling rate of leakage. Even with the clay lining, the problem persisted despite numerous investigations. In an attempt to mitigate the issue, the water level was initially reduced by three meters. Then, in 1946, the dam was breached in favor of a low-level weir channel, reducing the reservoir's capacity from 450,000 to 275,000 cubic meters. The exact date of the dam's decommissioning remains unclear, but once it occurred, the waterworks became surplus to requirements.



GRONK_Buxton_Waterworks8.jpg

[1]

GRONK_Buxton_Waterworks3.jpg

[2]

GRONK_Buxton_Waterworks7.jpg

[3]

GRONK_Buxton_Waterworks2.jpg

[4]

GRONK_Buxton_Waterworks4.jpg

[5]

GRONK_Buxton_Waterworks1.jpg

[6]

GRONK_Buxton_Waterworks6.jpg

[7]

GRONK_Buxton_Waterworks5.jpg

[8]​

Cheers for looking :thumb
Canon EOS 70D, 10-18mm EFS​
 
Top