Report - Tyne Pedestrian and Cycle Tunnel - Newcastle - June 11

Hide this ad by donating or subscribing !

Horus

Butt Wipe
28DL Full Member
Tyne Pedestrian and Cycle Tunnel

Another one on Solomon's List

In attendance: goan, forsaken, horus, Kinger

History

About us



The Tyne Pedestrian and Cyclist Tunnels (TPCT) were opened on 24th July 1951, heralded as Tyneside’s contribution to the ‘Festival of Britain’ (May to September 1951) at a total cost of £833,000.

They contained the first purpose-built cycle tunnel in the UK and were the earliest to be used by both cyclists and pedestrians.

The Tunnels run under the River Tyne between Howdon in North Tyneside and Jarrow in South Tyneside. The two tunnels run in parallel, the pedestrian tunnel has a 10 ft 6 in (3.2 m) internal diameter and the cycle tunnel has a larger 12 ft (3.7 m) internal diameter tunnel.

Both tunnels are 900 ft (274.5 m) in length, 40 ft (12.2 m) below the river bed, with floor levels 85ft (26 m) below high water level of the Tyne.

A special feature of the tunnels is their four original wooden-step Waygood-Otis escalators. At the time of construction, they were the longest single-rise escalators in the world, with a vertical rise of 85ft (25.9m) and a length of approximately 200ft (61m). They are believed still to be the longest wooden-step escalators in Europe.

In 2000, the tunnels were awarded Grade II listing to indicate their historic significance.

In 2010 the vertical lifts were repaired and modernised.

In 2012, a £6 million refurbishment, to include the replacement of two of the escalators with inclined lifts, will begin. The remaining two escalators will be preserved in situ because of their historic significance.

images.jpg
imagess.jpg


image013.jpg
image010.jpg


image007.jpg
1951.jpg


6A382EAA-933F-3DC7-A04D019C3467077C.jpg
imagees.jpg


Pictures

1.
IMG_0004.jpg

2.
IMG_0006.jpg

3.
IMG_0011.jpg

4.
IMG_0014.jpg

5.
IMG_0017.jpg

6.
IMG_0020.jpg

7.
IMG_0032.jpg

8.
IMG_0034.jpg

9.
IMG_0037.jpg

10.
IMG_0042.jpg

11.
IMG_0044.jpg

12.
IMG_0046.jpg

13.
IMG_0048.jpg

14.
IMG_0050.jpg

15.
IMG_0055.jpg


Thanks for viewing​
 
Last edited:

Smigg

28DL Full Member
28DL Full Member
Just had a search for my hometown on here and found this, nothing like resurrecting an old thread! I hope its allowed to add to it!
These tunnels closed for about 6 years and have recently re-opened after some refurbishments.
Two of the escalators have been removed and are being replaced with inclined elevator glass lifts - still in progress. The other two escalators are no longer moving, but they are a canny climb - the two old lifts are still in use though. Paving stones were lifted and replaced, lots of work done to remove asbestos. there is a bit info here. http://www.tynepedestrianandcyclist...8/10/TPCT-Progress-Booklet-Oct-2018_Rev-0.pdf
 