real time web analytics
Report - - Processor, Manchester, July 2013 | UK Draining Forum | 28DaysLater.co.uk

Report - Processor, Manchester, July 2013

Hide this ad by donating or subscribing !

Tom Sherman

28DL Full Member
28DL Full Member
Title : The processor drain, Manchester, july 2013.

Ive made a few mistakes sorry guys.

:D Visited With Nickindroy & NightShadow :D

With a few txt between a few of us we decided that I will show nickindroy & nightshadow The processor underground drain in Manchester while its hot and the water levels are low.
Me and nightshadow wore willies that turned out to be a mistake, because the entrance was a little deeper than expected, The water came upto my knees and nickindroy stayed dry as a bone with his waders.

Here is some info on the culvert

Originally discovered by siologen over a decade ago. Potters Lane, Combined Sewer Overflow to give it it's official name is a culverted section of Moston Brook, running just under 2 miles through a 3m RBP. An interesting mix of brick, into concrete, and back into brick again, with two processing units and an inspection chamber along the way.

Here are my shots, and thanks to the lads for helping with the lighting

9250764560_378d4daa7a_c.jpg


9247109623_e9d872db44_c.jpg


9250770318_e41ac63821_c.jpg


9250777612_b68f3849d7_c.jpg


9248003417_6ba2478e1e_z.jpg


9248010223_5695160a89_c.jpg


9250797798_8dfd46da4e_c.jpg


9250803366_67984ca51c_c.jpg


9250809486_082639a2bd_c.jpg


9248035349_8c84ab31f1_c.jpg


9248041653_20329c0dd6_c.jpg


9248048737_0804b5bc46_c.jpg


9250841448_0c3c80728f_c.jpg


9260587759_0bdc516a32_c.jpg


:thumb I hope you enjoyed my shots :thumb

Thanks for looking
 
Last edited:

Who has read this thread (Total: 5) View details

Top